Activity
From 2020-09-11 to 2020-10-10
2020-10-08
- 11:15 AM Capstone Support Revision 137: Updated and renamed Rubric for Design Report Preliminary Design Review Phase
2020-09-28
- 03:28 PM Capstone Support Revision 136: typos and clarification that students can NOT change the % complete, they can/should change the Status, so that the %complete gets updated.
- 09:27 AM Capstone Support Revision 135: Class 9 content added
2020-09-24
- 02:13 PM Capstone Support Revision 134: Add Individual Risk Analyses Rubric.
2020-09-21
- 02:18 PM Capstone Support Revision 133: fixed consistent naming
- 12:47 PM Capstone Support Revision 132: corrected agenda time
- 08:37 AM Capstone Support Revision 131: A Risk Analyses Memo template file was added.
2020-09-18
- 10:47 AM Capstone Support Revision 130: class 5 tweaks for the future... repo not forum for Design Report file
2020-09-17
- 04:21 PM Capstone Support Revision 129: Day 7 sitkcy not Gantt chart content added
- 09:12 AM Capstone Support Revision 128: fleshed out Day 6 content
2020-09-16
- 01:26 PM Capstone Support Revision 127: avoid use of dates in file names!!! and the word "Template" in the file name... because the students probably won't think to rename them to remove that... and SVN already tracks versions... thank you...
2020-09-14
- 03:51 PM Capstone Support Revision 126: Deleted ALL old templates for SoW, midterm, and final reports.
- Changed name of current DESIGN REPORT.docx
- 01:38 PM Capstone Support Revision 125: added link to report template..... file name should NOT include "template"
- 10:39 AM Capstone Support Revision 124: minor fixes to slide 57
- 09:40 AM Capstone Support Revision 123: Upload of new overall Design Report template documents/Design Report Template.docx(re-named from Final Report Template F20)
2020-09-11
Also available in: Atom