Activity
From 2020-08-19 to 2020-09-17
2020-09-17
- 04:21 PM Revision 129: Day 7 sitkcy not Gantt chart content added
- 09:12 AM Revision 128: fleshed out Day 6 content
2020-09-16
2020-09-14
- 03:51 PM Revision 126: Deleted ALL old templates for SoW, midterm, and final reports.
- Changed name of current DESIGN REPORT.docx
- 01:38 PM Revision 125: added link to report template..... file name should NOT include "template"
- 10:39 AM Revision 124: minor fixes to slide 57
- 09:40 AM Revision 123: Upload of new overall Design Report template documents/Design Report Template.docx(re-named from Final Report Template F20)
2020-09-11
- 06:58 PM Revision 122: Shifted EDN instruction onto Day 5, updated logistics of SoW exercise
- 12:09 PM Revision 121: added animation to the needs and requirements slide to not reveal the second bullet until after the vehicle discussion.
2020-09-09
- 08:22 PM Revision 120: Updated Playbook to move EDN/Documentation and Eng. Tools and Methods instruction from Class 4 to Class 5
- 09:52 AM Revision 119: some additional comments noting that none of us control the internet quality
- 09:20 AM Revision 118: some formatting, added a hyperlink to get straight to the tips section
- 09:02 AM Revision 117: updated to provide support for ABET professional and societal considerations during requirements gathering
- 09:00 AM Revision 116: JK created, to help software focused work better than the metrics based N&R spreadsheet does. One of MANY possible tools additional tools that might benefit software work.
2020-09-08
- 04:00 PM Revision 115: terminology adjustment in Day 4 agenda, highlighted full list of Day 3+4 activities
- 09:09 AM Revision 114: Changed "Day Two" to "Day Three" on Eng. N/R slide
2020-09-04
- 02:21 PM Revision 113: added hyperlinks to get to the class agendas. revision history now two pages...
- 09:18 AM Revision 112: Added Note to Class 2 Out of Class Tasks regarding prior semesters' presentations
2020-09-03
- 04:58 PM Revision 111: user story content, fixed Day 3 agenda times
- 08:15 AM Revision 110: added time callouts to Day 3, location updates to Day 4, added purchasing to 'must document' list
2020-09-02
- 12:49 PM Revision 109: many changes related to days 2 & 3 content. consult revision table for details
2020-09-01
- 05:36 PM Revision 108: updated for clarity
- 04:56 PM Revision 107: see version table - bunch of stuff related to Design Process, Documentation, and EDN usage
2020-08-31
- 03:50 PM Revision 106: see revision table - light formatting, added whenisgood for out of class meeting scheduling
- 12:16 PM Revision 105: Removed unwanted text boxes (make it pretty, etc.)
- 09:51 AM Revision 104: Updates MDL directional entry, shop room no., online safety training, and PE notification for shop use.
2020-08-30
- 07:38 PM Revision 103: table formatting changes, couple new links for questions.
- Finally at version 1.0
2020-08-29
2020-08-28
- 03:14 PM Revision 101: Added Playbook to Repo
- 02:30 PM Revision 100: accidentally created / not needed... empty!
- 09:21 AM Revision 99: small change in Notes at bottom
2020-08-26
Also available in: Atom