Activity
From 2023-08-03 to 2023-09-01
2023-09-01
2023-08-31
- 03:32 PM Revision 573: fixed miscalculation in Day 2 agenda timing
- 12:32 PM Revision 572: Clarified one thought per Post-It in ideation, added speaker note to Day 2 Action Items slide
- 12:24 PM Revision 571: should we include in playbook for reference?
- 08:53 AM Revision 570: The Day 5 agenda included ETM, but it was not defining in the Playbook. Hence, I added ETM to the Engineering Tools and Methods slide so students can find the definition using the Find command.
2023-08-29
2023-08-28
- 04:34 PM Revision 568: Replaced Paul Chow’s photo with Russ Kraft's photo on "Faculty – Chief Engineers", Slide 13.
- 03:12 AM Revision 567: Added the following files: final Design Report Rubric.docx, Final Design Review Rubric.docx, and Final Poster Rubric.docx.
- 02:27 AM Revision 566: Fixed typos.
- 01:37 AM Revision 565: Added Client Meeting 2 and 3 rubrics.
- 12:44 AM Revision 564: Added both .xlsx and .pdf versions of Technical Memo Rubric.
- 12:39 AM Revision 563: Project Statement and Objectives Rubric.docx.
- 12:04 AM Revision 562: Added BDR rubrics - Individual and Team.
2023-08-27
- 11:10 PM Revision 561: Add the following fields: student, reviewer, and date.
- 10:58 PM Revision 560: Added Technical Progress and Project Management Rubric.
- 10:23 PM Revision 559: Added the version for the fall of 2023.
2023-08-25
- 02:47 PM Revision 558: Changes to slides 8,13,14,17,43,103,105,106
- per KD
2023-08-24
- 03:25 PM Revision 557: broken Mediasite links fixed
- 01:27 PM Revision 556: minor fix terms
- 09:56 AM Revision 555: Agreement of Action Items between Playbook slides and Capstone Support Wiki
2023-08-23
- 03:07 PM Revision 554: Deleting Obsolete files
- 03:06 PM Revision 553: Renamed to correct spelling errors
- 02:41 PM Revision 552: removed obsolete, replaced with new
- 10:44 AM Revision 551: action items updated
- KD suggestions incorporated from 8/21
- 07:06 AM Revision 550: Updated the Technical Memo due date in the Action Item Before Day 8.
2023-08-22
- 07:54 PM Revision 549: Changed name from Client Meeting 1.pptx to Client Meeting to reflect use of one template for all meetings.
- 04:39 PM Revision 548: Updated location for Team Building Event
- 03:48 PM Revision 547: Deleted Team Standards Agreement.docx as all content has been moved to wiki.
- 03:37 PM Revision 546: Committing AACU Teamwork Rubric.pdf
- 02:18 PM Revision 545: changes made with Aren to match up Action Items with on-site meeting contents
- 01:41 PM Revision 544: new for this semester
- 11:53 AM Revision 543: tickets out -> employee survey
- URLs checked and updated
- 10:13 AM Revision 542: url's checked and updated throughout
2023-08-21
- 04:26 PM Revision 541: Added Team-Building Retreat
- 03:38 PM Revision 540: review and light terminology changes
- 01:14 PM Revision 539: nearly final updates to Playbook
- Agenda schedule slide timing and language updated and distributed through Playbook.
2023-08-18
- 03:37 PM Revision 538: Brad/Mark/Aren meeting. Need to merge in changes from Aren's PC.
- 10:27 AM Revision 537: nearly final walk through to make final changes for F23
- - fix page numbers
- deleted slides hidden during development
- some added animation
2023-08-17
- 05:03 PM Revision 536: Day 9+10 removed
- all hand meetings added to end
various changes to PSO and engineering tools + methods slides
some format massaging t... - 02:31 PM Revision 535: Committing Project Statement and Objectives.docx
- 11:49 AM Revision 534: Renamed Design Report.docx to Final Design Report.docx
- 11:49 AM Revision 533: updated 'class' terminology throughout
- some formatting and other tweaks
- 11:47 AM Revision 532: Updated templates for Design report and technical memo.
- 11:32 AM Revision 531: revised per course development work
- 10:36 AM Revision 530: formatting and terminology changes
- hid the SoW slides
2023-08-16
- 04:34 PM Revision 529: found/added Post-It graphic and fixed that spelling from "Post It" to "Post-It"
- 04:30 PM Revision 528: team meetings yielded changes for narrative and some general improvements. a few notes are embedded for more changes. Team meeting stopped at day 8, I made comparable changes to rest of the slides to help speed the final meeting.
- 12:20 PM Revision 527: changes from today's meeting
2023-08-14
- 04:34 PM Revision 526: some more narrative work
- 12:15 PM Revision 525: new Needs and Requirements slides merged in
2023-08-11
- 02:02 PM Revision 524: narrative terminology changed throughout
- 01:46 PM Revision 523: narrative terminology mostly changed over
- 10:56 AM Revision 522: single 'tech approach/accomplishment/demo' slide split into 3 separate slides
- 10:51 AM Revision 521: removing PDR from filename
- 10:00 AM Revision 520: instructions shifted from this document to Wiki page
- https://designlab.eng.rpi.edu/edn/projects/capstone-support-dev/wiki/Poster
2023-08-09
2023-08-08
- 05:21 PM Revision 518: Added the Review and Update Prooject Plan slide.
- 04:52 PM Revision 517: completed some font size / spacing fixes
2023-08-04
- 03:37 PM Revision 516: some wraparound narrative language additions
- 01:58 PM Revision 515: Updates to classes 1-4 to remove COVID language, introduce team building activity, and begin reframing.
- 10:31 AM Revision 514: term change. Sponsor -> Client
- 10:24 AM Revision 513: term changes. Sponsor -> Client
- 09:55 AM Revision 512: terminology change from sponsor -> client
Also available in: Atom