Project

General

Profile

Activity

From 2026-07-19 to 2026-08-17

2026-08-17

05:48 PM Revision 1028: Converted and added fillable PDF rubrics.
Client Meeting 2 Rubric.docx (r1027)
Board of Director Review Rubric - Team.docx (r1025)
Board of Director Review Rub...
Junichi Kanai

2026-08-14

12:51 PM Revision 1027: Updated CM#2 rubric. All criteria are matched to different sections in the CM#2 template. Rubric updated accordingly.
Kannathal Natarajan

2026-08-13

04:48 PM Revision 1026: Updated Technical Memo rubric (changed from Benchmarking memo to Technical Memo), BDR -Individual rubric (removed openness criteria and replaced it with participation. updated rubric accordingly) and Concept selection rubric (replaced the N&R, UC and US to Engineering Definition).
Kannathal Natarajan
04:10 PM Revision 1025: Updated Board of Directors review rubric
Kannathal Natarajan
03:20 PM Revision 1024: 37 - Update rooms for Team Building Retreat
Aren Paster

2026-08-11

02:09 PM Revision 1023: Agenda schedule
System Design shifted from Day 10 to Day 7
Playbook
Time & slides for System Design shifted from Day 10 to Day 7
37 ...
Aren Paster

2026-08-10

02:41 PM Revision 1022: Playbook - safety training deadline moved to class 5
Tech Demo - added level of difficulty score Aren Paster
01:31 PM Revision 1021: some clarifying and formatting of graphics. And improvement in student names :)
Aren Paster
01:16 PM Revision 1020: added note that images DO NOT count against 4-page limit.
Aren Paster

2026-08-06

04:04 PM Revision 1019: Added the Customer Types worksheet to Needs and Requirements workbook.xlsx.
Junichi Kanai

2026-07-27

01:08 PM Revision 1018: added table for Ethical and Professional Responsibilities Worksheet Appendix
Aren Paster
11:56 AM Revision 1017: shifted formatting from 'single spaced' to current standard 1.15 spacing.
Aren Paster

2026-07-24

12:21 PM Revision 1016: these match the system architecture diagrams already on the EDN
Mark Anderson
 

Also available in: Atom