Deleting old rubric
Add the fillable PDF version of the final design review form.
Added BDR fillable PDF and Excel file.
Revised the rubric to improve its clarification.
Added the Excel versions of rubrics and feedback form, except BDR and Final Desin Review.
this was marked as DRAFT inside. The "real" document name is Project Statement and Objectives, so the existence of this draft might be confusing.
Fixed a typo: END -> EDN.
Created and added for the first Technical Progress and Project Management assessment.
Updated the table heading for clarification.
Added the Engineering Tools and Methods Feedback Form files.
Added the PDF and Excel versions.
Updated the sores.
1. Project Overview row 1.1 Deleted "relevant background information" because of duplication.1.2 "long-term goals" was replaced by "with the client's goals" for clarification.2. Customer Needs and Engineering Requirements2.1 "specifications" was replaced by "requirements" because of consistency.
migrated from Box to repo after small cleanup
Added the following files: final Design Report Rubric.docx, Final Design Review Rubric.docx, and Final Poster Rubric.docx.
Fixed typos.
Added Client Meeting 2 and 3 rubrics.
Added both .xlsx and .pdf versions of Technical Memo Rubric.
Project Statement and Objectives Rubric.docx.
Added BDR rubrics - Individual and Team.
Add the following fields: student, reviewer, and date.
Added Technical Progress and Project Management Rubric.
Deleting Obsolete files
Renamed to correct spelling errors
Updated the formulas for calculating the report grade.
Deleted unused rubrics to avoid confusions.
Fixed grammatical errors.Added "Required" to the Comment cell in the students form.
Delete Many, Numerous, Some, and Few from the Documentation section.
Change the scores from the 4.0 scale to the 100.0 scale.Updated Design Report Phase 1, Documented Technical Contributions, and Project Management Rubrics.
Uploaded the PDF version.
Updated the number of posts needed.
Corrected the numeric score for "C"
Changed some words based on KD's suggestions that clarified grading criteria.
Revised the individual presentation section.
removing old file
fixed typo in filename
Updated F22 rubrics
'Status Report' renamed to 'Status Update'
un-italicized comments
slight formatting change to get document to 2 pages
standardized names for all 3 Design Report rubrics
changed the C=3.0 to C=2.0DID NOT CHANGE THE DATES at top of file, as this is the only change.
Project Name was change to Student Name.
Updated the formulas.
Fixed typo - Changed "3.0(C)" to "2.0(C)" in table header
Revised based on AP's feedback.
Safety was eliminated. Scores are weighted.
Added the Word version of the file.
Added the F21 version of Project Management Rubric, both Word and PDF.
Added an updated PDF version of Documented Technical Contributions Rubrics.
Added the Word version of Documented Technical Contributions Rubric.
changed name of assignment & rubric from Benchmarking to Background Memo
Added Project Plan; Weighted scoared are calculated by functions.
The heading was updated to make it easier for CEs to figure out numeric scores.
Heading was updated; Weights were added; Safety was removed.
Weighted scores are calculated by the functions.
formatting and grammar/clarity revisions to new rubrics
This record keeping rubric uses the weekly evaluation approach.
This rubric uses the weekly evaluation approach.
swapped weight of technical writing and syntax/mechanicsslight grammatical changesfixed duplication of description in tech writing row
The criteria were updated.
Added the rubrics prepared by AACU (Association of American Colleges and Universities).
updated descriptions in rubric per comments
renamed to be clearer
The attached PPT file states the current ABET Criterion 3 Student Outcomes and Criterion 5 Capstone Design.
marked up in an attempt to better tie to ABET 3.7
The rubrics were reworded based on KS's recommendations.
added Benchmarking Memo rubric
test, no changes to file
Updated Final Report Form.docx and Final_Design_Review_Form.docx.
Added a PDF version of the Project Management Rubric.
Added the Project Management Rubric.
Updated the form according to KD's edits.
Updated the rubric for the new report template.
Add numerical scores to the rubric.
Oral Communication Rubric for F20
Documented Technical Contributions for F20.
Updated and renamed Rubric for Design Report Preliminary Design Review Phase
Add Individual Risk Analyses Rubric.
reverting back to MY updated Rubric, which fixes the tabbing order on pg 2
Updated PDR review form - corrects formating error on individual presentation
updated PDR rubric
update oral communication rubric spelling
spelling correction
Update spelling errors on Status report rubric 1, plus KAD suggested edits for rubric for summer consideration.
Add oral communication feedback review rubric
upload team performance rubric for CE feedback
New rubrics for Spring 2020 class lesson plan changes
removed M2 from file name
updated Preliminary Design Review Form with comment box at bottom..docx swapped out for fillable PDF version
A folder for keeping self-evaluation rubrics is created.