corrected activity type markers - triangle/square/circle
now includes benchmarking
updates on meeting with AP, BD, MA
many changes and updates based on meeting - AP, MA, BD
some updates based on AP + MA meetings week of 7/1
formatting updates
updated Agendas and Out of Class task lists per meeting between AP and MA
updates so far today- Aren and Mark
part way through draft updates to F24 plan and approach
fixed formula on summary sheet
hacking to develop the F24 version
updated BDR introduction slides
fixed typo on Day 9 agenda (8->9)
file name format for memo changed to match wiki instructions
tweaks to Kathryn's content from her
project -> vehicle to reduce confusion
formatting improvements on Needs & Reqs 85-87
updated grammar per KD on slide 99
fixed agreement of need+reqs slides 86+87
Updated Needs and Requirements Activity slides
Updated Day 5 Wrap-Up slides
Updated Day 3 Wrap-Up Slide
Added the latest version number, 4.0, of the online safety training to the Action Items slides.
Updated ideation poster slides to account for use of whiteboard
Added missing word to Day 2 wrap-up
fixed color issue
Excel file which drives the image on bottom of Tasks and Due Dates page in Capstone Support Wiki
combined Fall and Spring visual calendar vs Capstone # Day into a single file
added Slido info for Day 1 Ice Breaker
added subversion list of tools used
fix timing on Day 3 agenda
changed language on p12
Made the URL for the instructions for taking the online safety training clickable.
The instructions for taking the online safety training course was moved to the Repository, and the links were updated.
Updated class 3-9 wrap-up slides.
corrected some timing of activitiesupdated links/times for Team Building Retreat
Action items updated
Updated all agenda slides in Excel and added to PlaybookGraphic to map calendar days to on-site meeting #'s
Updated speaker notes, identified "You are here" on Design Process slides.
Minor Action Items/Meeting Prep minor update/cleanup
Changed from “scaffolded sessions” to “scaffolded meetings”, rearranged Action Items/Meeting Prep slides to put Project work @ bottom
something
few small changes
Updates to Action Items and Wrap-up slides for first week.
Playbook Rev. 2.1 - Revised EDP slide to “Universal”, added wrap-ups @ end of each day to discuss next day’s activity, changed from “Employee Onboarding” to “Project Scoping” after Day 2.
added PNG of Ideation poster for 'ease' of printing in Adobe IllustratorNeeds and Req Day added to scaffolded schedule as (new) Day 5, shifting out (former) Day 5-8 to (new) Day 6-9.
added icebreaker and new day 5 for needs and requirements work. Left note on slide where day renumbering needs to take place
Playbook - Ideation poster callback added
PPT for Ice Breaker for EACH side of room w/ custom url to word cloud
Growth Mindset ice breaker activity swapped in for Wave activity on Day 1
removed "company" improved CE topics for day 3+4 meetings
Calendar view of scaffolded sessionsadded to https://designlab.eng.rpi.edu/edn/projects/capstone-support-dev/wiki/Capstone_Daily_Agendas
change to Day 7 to highlight reflection on Project Plan
updated class 8 end slide to include eng standards assignment due
altered times for day 7 to clearly call out the reflection time
Replaced the long term and short term slide with KD's re-typeset version.
Included additional slides about technical communication provided by Prof. Dannemann.
updated Communication slides in Day 5
duplicated N&R slides for day 4
improvement to User Story slide
posting location of Skill Assessment
fixed miscalculation in Day 2 agenda timing
Clarified one thought per Post-It in ideation, added speaker note to Day 2 Action Items slide
should we include in playbook for reference?
The Day 5 agenda included ETM, but it was not defining in the Playbook. Hence, I added ETM to the Engineering Tools and Methods slide so students can find the definition using the Find command.
small formatting changes
Replaced Paul Chow’s photo with Russ Kraft's photo on "Faculty – Chief Engineers", Slide 13.
Changes to slides 8,13,14,17,43,103,105,106per KD
broken Mediasite links fixed
minor fix terms
Agreement of Action Items between Playbook slides and Capstone Support Wiki
action items updatedKD suggestions incorporated from 8/21
Updated the Technical Memo due date in the Action Item Before Day 8.
Updated location for Team Building Event
changes made with Aren to match up Action Items with on-site meeting contents
tickets out -> employee surveyURLs checked and updated
url's checked and updated throughout
Added Team-Building Retreat
review and light terminology changes
nearly final updates to PlaybookAgenda schedule slide timing and language updated and distributed through Playbook.
Brad/Mark/Aren meeting. Need to merge in changes from Aren's PC.
nearly final walk through to make final changes for F23- fix page numbers- deleted slides hidden during development- some added animation
Day 9+10 removedall hand meetings added to endvarious changes to PSO and engineering tools + methods slides
some format massaging throughout
updated 'class' terminology throughoutsome formatting and other tweaks
formatting and terminology changeshid the SoW slides
found/added Post-It graphic and fixed that spelling from "Post It" to "Post-It"
team meetings yielded changes for narrative and some general improvements. a few notes are embedded for more changes. Team meeting stopped at day 8, I made comparable changes to rest of the slides to help speed the final meeting.
changes from today's meeting
some more narrative work
new Needs and Requirements slides merged in
narrative terminology changed throughout
narrative terminology mostly changed over
minor change to needs & req's. NOT yet adding gameful
Added the Review and Update Prooject Plan slide.
completed some font size / spacing fixes
some wraparound narrative language additions
Updates to classes 1-4 to remove COVID language, introduce team building activity, and begin reframing.
term changes. Sponsor -> Client
revision history moved to END of document and cleared for F23 semester
notes, small changes
updated Ticket Out link