tickets out -> employee surveyURLs checked and updated
url's checked and updated throughout
Added Team-Building Retreat
review and light terminology changes
nearly final updates to PlaybookAgenda schedule slide timing and language updated and distributed through Playbook.
Brad/Mark/Aren meeting. Need to merge in changes from Aren's PC.
nearly final walk through to make final changes for F23- fix page numbers- deleted slides hidden during development- some added animation
Day 9+10 removedall hand meetings added to endvarious changes to PSO and engineering tools + methods slides
some format massaging throughout
Committing Project Statement and Objectives.docx
Renamed Design Report.docx to Final Design Report.docx
updated 'class' terminology throughoutsome formatting and other tweaks
Updated templates for Design report and technical memo.
revised per course development work
formatting and terminology changeshid the SoW slides
found/added Post-It graphic and fixed that spelling from "Post It" to "Post-It"
team meetings yielded changes for narrative and some general improvements. a few notes are embedded for more changes. Team meeting stopped at day 8, I made comparable changes to rest of the slides to help speed the final meeting.
changes from today's meeting
some more narrative work
new Needs and Requirements slides merged in
narrative terminology changed throughout
narrative terminology mostly changed over
single 'tech approach/accomplishment/demo' slide split into 3 separate slides
removing PDR from filename
instructions shifted from this document to Wiki pagehttps://designlab.eng.rpi.edu/edn/projects/capstone-support-dev/wiki/Poster
minor change to needs & req's. NOT yet adding gameful
Added the Review and Update Prooject Plan slide.
completed some font size / spacing fixes
some wraparound narrative language additions
Updates to classes 1-4 to remove COVID language, introduce team building activity, and begin reframing.
term change. Sponsor -> Client
term changes. Sponsor -> Client
terminology change from sponsor -> client
completed based on team consensus in yesterday's Course Development meeting. May need a final tweak for PowerPoint format compatibility.
still early draft. Corresponding wiki page in process as well.
updated template w/ Mark's comments
Renaming File to convey use for Sponsor Meeting 1 and Preliminary Design Review
Sponsor Meeting/Preliminary Design Review Slide Deck Template
Updated Agenda Slide to accommodate dual purposes (Status Update 1 and Mid-Term Review)
revision history moved to END of document and cleared for F23 semester
tagging Playbook as it existed end of Spring 2023 semester
renamed to reflect new language
Find & replace 'Background' with 'Technical'slight wording changes
slight content, format, grammar updates
small mods, awaiting more feedback
updated for KD feedback. Need team feedback / possible tweaking. Instructions updated.
adding first draft. proposal is to shift emphasis of sponsor meetings away from typical project management status updates to be more "agile" and focus on gaining project clarity and showing results to date.
notes, small changes
tweaks
instructions to post team contact info to wiki and class 2 questions to forum
more comments, fixed file names.
renamed to match content. Can be spliced into one video or just left separately
better name, more generic
new checklist style rubric for meeting agenda. Can be used by teams at the start of each meeting and/or used by DL team to observe / coach / record progress
few spelling & grammar changesExpense Report changed from Optional to Mandatory
inventory list of all parts in cabinets in shop. previously documented on Wiki - https://designlab.eng.rpi.edu/edn/projects/capstone-support-dev/wiki/Design_Lab_Cabinet_Inventory
Updated and added Fabrication Space Assignments.pdf.
delete temp file
re-recorded clips for having info in the wiki not a forum
new material for posting contact info to the wiki instead of the background forum
Updated the formulas for calculating the report grade.
Deleted unused rubrics to avoid confusions.
tag the Rubrics folder so that we can clean the folder.
Fixed grammatical errors.Added "Required" to the Comment cell in the students form.
We no longer print posters! Instructions updated!!
updated Ticket Out link
Numerous changes intended to guide students to put the content directly on the wiki page, not as any attached files / documents. This addresses many questions for clarification in SP23.
improvements for Background memo slides to clarify expectations and mechanics
found a different way to create the start of semester tag AFTER the start of the semester
agenda color coding fixed
Delete Many, Numerous, Some, and Few from the Documentation section.
moved project info line to header to repeat on all pages
Formatting adjustments p81-83
Change the scores from the 4.0 scale to the 100.0 scale.Updated Design Report Phase 1, Documented Technical Contributions, and Project Management Rubrics.
Added content and time for Technical Communication topic on Day 5
Updated Team Standards Agreement Template to reflect completion by Class 6 instead of over the course of the first 5 weeks.
Updated Team Standards Agreement Template to reflect completion by Class 6 instead of over 5 weeks.
compressed images
corrected 'PDR' to 'Midterm' Forum reference
Changed F22 to S23 in Slide 98.Updated the Background Memo due dates.
Added speaker notes to and animated prompts on Day 2 poster slide
found another When Is Good > WhenIsGood and added When2Meet
two minor changes
clarify 'MS Word' document for in-class activity
Fixed TSA due date in Class 2 from five weeks to Class 6
Uploaded the PDF version.
Updated the number of posts needed.
class 1 we now do team building stuff in class, so deleted from Out of Class tasks
Revised for the spring of 2023.
added mention of team ideation poster to Class 2 out of class tasks
updated Ticket Out links
CE pictures updated for Spring 23 roster
Shifted some discussion time on Day 2 from poster summary to question classificationSlight adjustments to match out of class content in Playbook with Wiki
Day 1 – “2 additional questions” for Out of Class tasks, Day 2 - Slight timing shift for technical tasks. Standardized box outline weight to 2.25 pt, added updating to most sections of Design ReportFinished documentation content shift from class 2 to 5
updates to day 2 schedule graphics
improved sections table and pointed to tech writing in Capstone Support wiki
many changes which will be explained in next commit
Added 4 page length requirement from Wiki explanation.
updated day 2 Agenda slides
Day 2 content changed and some shifted to Day 5 - documentation & ideation exercise summary
Corrected the numeric score for "C"