updated grammar per KD on slide 99
fixed agreement of need+reqs slides 86+87
Added the PDF and Excel versions.
Updated the sores.
Updated Needs and Requirements Activity slides
Updated Day 5 Wrap-Up slides
Updated Day 3 Wrap-Up Slide
bottom of slide 5 updated to match Design Process content at top
Added the latest version number, 4.0, of the online safety training to the Action Items slides.
Added the Spring 2024 space allocation.
Updated ideation poster slides to account for use of whiteboard
Added missing word to Day 2 wrap-up
fixed color issue
Excel file which drives the image on bottom of Tasks and Due Dates page in Capstone Support Wiki
combined Fall and Spring visual calendar vs Capstone # Day into a single file
added Slido info for Day 1 Ice Breaker
added subversion list of tools used
fix timing on Day 3 agenda
changed language on p12
Made the URL for the instructions for taking the online safety training clickable.
The instructions for taking the online safety training course was moved to the Repository, and the links were updated.
Added the instructions for taking the online safety training course.
Updated class 3-9 wrap-up slides.
Added the Spring 2024 meeting spaces.
corrected some timing of activitiesupdated links/times for Team Building Retreat
Action items updated
Updated the Common Course Syllabus files for the spring of 2024.
Updated all agenda slides in Excel and added to PlaybookGraphic to map calendar days to on-site meeting #'s
Updated speaker notes, identified "You are here" on Design Process slides.
Minor Action Items/Meeting Prep minor update/cleanup
Changed from “scaffolded sessions” to “scaffolded meetings”, rearranged Action Items/Meeting Prep slides to put Project work @ bottom
something
few small changes
Updates to Action Items and Wrap-up slides for first week.
Playbook Rev. 2.1 - Revised EDP slide to “Universal”, added wrap-ups @ end of each day to discuss next day’s activity, changed from “Employee Onboarding” to “Project Scoping” after Day 2.
added PNG of Ideation poster for 'ease' of printing in Adobe IllustratorNeeds and Req Day added to scaffolded schedule as (new) Day 5, shifting out (former) Day 5-8 to (new) Day 6-9.
added icebreaker and new day 5 for needs and requirements work. Left note on slide where day renumbering needs to take place
Playbook - Ideation poster callback added
PPT for Ice Breaker for EACH side of room w/ custom url to word cloud
Growth Mindset ice breaker activity swapped in for Wave activity on Day 1
Added Glossary page. Wiki has also been updated.
removed "company" improved CE topics for day 3+4 meetings
Committing Instruction Manual for ABB Robot Cell
1. Project Overview row 1.1 Deleted "relevant background information" because of duplication.1.2 "long-term goals" was replaced by "with the client's goals" for clarification.2. Customer Needs and Engineering Requirements2.1 "specifications" was replaced by "requirements" because of consistency.
Deleted "and Engineering Specifications" from Section 5 heading.
deleted column one which was confusing students on tracking # vs explanation
migrated from Box to repo after small cleanup
Calendar view of scaffolded sessionsadded to https://designlab.eng.rpi.edu/edn/projects/capstone-support-dev/wiki/Capstone_Daily_Agendas
Added System Evaluation Worksheet.
change to Day 7 to highlight reflection on Project Plan
updated class 8 end slide to include eng standards assignment due
altered times for day 7 to clearly call out the reflection time
formatting to improve clarity of Repo url
Replaced the long term and short term slide with KD's re-typeset version.
Included additional slides about technical communication provided by Prof. Dannemann.
Added Capstone Design Showcase Information file.
updated Communication slides in Day 5
all semester / date info removed, file moved from Box to here
Clarified instructions to include selecting "Show Log" from Tortise SVN.
duplicated N&R slides for day 4
Update the Excel version of the Fabrication Space Assignments for F23.
Added F23 Fabrication Space Map
improvement to User Story slide
posting location of Skill Assessment
fixed miscalculation in Day 2 agenda timing
Clarified one thought per Post-It in ideation, added speaker note to Day 2 Action Items slide
should we include in playbook for reference?
The Day 5 agenda included ETM, but it was not defining in the Playbook. Hence, I added ETM to the Engineering Tools and Methods slide so students can find the definition using the Find command.
small formatting changes
Replaced Paul Chow’s photo with Russ Kraft's photo on "Faculty – Chief Engineers", Slide 13.
Added the following files: final Design Report Rubric.docx, Final Design Review Rubric.docx, and Final Poster Rubric.docx.
Fixed typos.
Added Client Meeting 2 and 3 rubrics.
Added both .xlsx and .pdf versions of Technical Memo Rubric.
Project Statement and Objectives Rubric.docx.
Added BDR rubrics - Individual and Team.
Add the following fields: student, reviewer, and date.
Added Technical Progress and Project Management Rubric.
Added the version for the fall of 2023.
Changes to slides 8,13,14,17,43,103,105,106per KD
broken Mediasite links fixed
minor fix terms
Agreement of Action Items between Playbook slides and Capstone Support Wiki
Deleting Obsolete files
Renamed to correct spelling errors
removed obsolete, replaced with new
action items updatedKD suggestions incorporated from 8/21
Updated the Technical Memo due date in the Action Item Before Day 8.
Changed name from Client Meeting 1.pptx to Client Meeting to reflect use of one template for all meetings.
Updated location for Team Building Event
Deleted Team Standards Agreement.docx as all content has been moved to wiki.
Committing AACU Teamwork Rubric.pdf
changes made with Aren to match up Action Items with on-site meeting contents
new for this semester
tickets out -> employee surveyURLs checked and updated
url's checked and updated throughout
Added Team-Building Retreat
review and light terminology changes
nearly final updates to PlaybookAgenda schedule slide timing and language updated and distributed through Playbook.
Brad/Mark/Aren meeting. Need to merge in changes from Aren's PC.
nearly final walk through to make final changes for F23- fix page numbers- deleted slides hidden during development- some added animation