minor tweaks to instructions
told where to pot preliminary deliverables
added RPI and DL logos to 1st slideTime added to day 6 + 7 for deliverablesslight grammar and formatting fixes throughout
slido updated and time + slides for deliverables added
addressed some issues Mark found 8/21
various small formatting and grammar 'fixes'
re-implemented most of earlier changes and further tweaks. NO actual content change.
formatting/aesthetics
formatting changesupdated Agenda slides days 9+10
PPT to document concepts generated for project
Update the following slides:Slide 12 - Slido to understand students expectations on capstone.Slide 28/29 - Overview of Capstone Course.
Day 9/10 team Agenda block reduced to 30 minsDay 9/10 added 10 mins of CE reflection on Client Meeting 1
Removed daily reminders to download PlaybookModified formatting of Out of Class Task reminder slides
minor formatting, no material changes
Added new templates for Client MeetingsRemoved old client meeting template to not confuse students
changes based on today's several hours of meetings :)
small changes
Added the second documentation slide (#19).
formatting and content adjustments based on full PE meeting
Day 4 agenda shifted to FULL class discussion of Benchmarking
Some content pulled out of Playbook into Wiki - Needs & Reqs
Mark messed Aren up
hfdskhfkdsahf
updates
schedule - adjust Day 6playbook - OneDrive now allowed for team documents, some content/flow cleanup
Update Jetson guide
many changes based on group PE meeting to iron out problems and smooth out changes
fixed typo
added column for 'Name'
"Design a Vehicle" activity pulled out of Playbook and put into a separate PPT for optional training session.
some formatting and updates
document for teams to capture Day 2 in-class discussion of skills
never heard of this "pre commit hook", interesting
document to capture Day 2 class discussion
Update the gpio test script for RPi for use with the board
PlaybookNEWEST Agenda slides addedcolor coding changed on Design process roadmap slides
Agendaformatting, aesthetics of split activities
KN & AP discussion - Updates and Comments added to some slides (Class 1 - 5)
changes captured in change log. I already forget what they were.
Playbook - adjusted flow to match Agendas betterAgendas - formatting and 'prettification', 'Q&A' activities retitled to 'Intro'
corrected activity type markers - triangle/square/circle
new generic videos for making forum and wiki posts
now includes benchmarking
updates on meeting with AP, BD, MA
many changes and updates based on meeting - AP, MA, BD
some updates based on AP + MA meetings week of 7/1
formatting updates
updated Agendas and Out of Class task lists per meeting between AP and MA
updates so far today- Aren and Mark
part way through draft updates to F24 plan and approach
fixed formula on summary sheet
tagging Playbook as it existed at end of Spring 2024 semester
hacking to develop the F24 version
Moved from the ebess-devices project where this was born. All the history is there. This version has been verified and mass produced.
for the universal ESP32 prototyping PCB
for things related to the ESP32 in it's various forms
Add webcam test code as a .zip
Instructions for ROS2 on Raspberry Pi
Test instructions for Jetson and Raspberry Pi.
Code for Webcam test example - ROS2 on Raspberry Pi
Added ABET Criteria numbers to Student Learning Outcomes for easy reference.
Deleting old rubric
Add the fillable PDF version of the final design review form.
written in 2019 but apparently never added to repo. identifies the output from each phase
Changed the style of References to Heading 1, and updated the Table of Contents to show References.
The new worksheet was created and added to the repository.
Added BDR fillable PDF and Excel file.
Revised the rubric to improve its clarification.
updated BDR introduction slides
fixed typo on Day 9 agenda (8->9)
file name format for memo changed to match wiki instructions
Added the Excel versions of rubrics and feedback form, except BDR and Final Desin Review.
this was marked as DRAFT inside. The "real" document name is Project Statement and Objectives, so the existence of this draft might be confusing.
Fixed a typo: END -> EDN.
Created and added for the first Technical Progress and Project Management assessment.
Added the instruction for showing a completion certificate.
Updated the table heading for clarification.
Added the Engineering Tools and Methods Feedback Form files.
standard template for user stories. titles match wiki page descriptions
original and now obsolete. too complicated to use
tweaks to Kathryn's content from her
project -> vehicle to reduce confusion
formatting improvements on Needs & Reqs 85-87
updated grammar per KD on slide 99
fixed agreement of need+reqs slides 86+87
Added the PDF and Excel versions.
Updated the sores.
Updated Needs and Requirements Activity slides
Updated Day 5 Wrap-Up slides
Updated Day 3 Wrap-Up Slide
bottom of slide 5 updated to match Design Process content at top
Added the latest version number, 4.0, of the online safety training to the Action Items slides.
Added the Spring 2024 space allocation.
Updated ideation poster slides to account for use of whiteboard
Added missing word to Day 2 wrap-up
fixed color issue
Excel file which drives the image on bottom of Tasks and Due Dates page in Capstone Support Wiki
combined Fall and Spring visual calendar vs Capstone # Day into a single file
added Slido info for Day 1 Ice Breaker
added subversion list of tools used
fix timing on Day 3 agenda
changed language on p12