confirmed all instructions shown in blue font - for deletionimproved consistency of instructions between all 4 templatesslight grammar and format adjustmentspg 1 - example date changed to MM/DD/YY
- agreement between agenda and slides- Appendix added CM 2,3,4- Added table for Objectives and Deliverables CM2- Project Status removed from CM2- shift intro slides to Appendix for CM 3+4
deleted extra space in filename
Updates in Client meeting slides during the meeting on 6/18
tagging all rubrics used for Spring 2026 semester
tagging rubrics used Spring 2026
some font and grammar adjustmentstext box outlines standardized at 3pt red
tagging Playbook at end of semester
updated to Fall 26 dates
Fixed broken fillable fields.
reset template to standard aspect 4:3
swapped old logo for new RPI branding
removed all old RPI logos, replaced with new solid black bar variety
fixed url to Interface Examples
modifications to improve clarity
updated week 6 EDN usage numbers
updated with week 5 data
removed System Design from Day 10 agenda, had previously been added to Day 7
update of EDN usage, improved takeaway box on Day 10 slide
Added the Using Issues wiki page in EDN to Slide 170.
Added slide for Project Risk to Day 9
updated EDN usage slides for Day 8 + 9
Improved the wording for the Response to Question section.
found another place where only N&R were referenced. Any part of the Eng. Deg. can serve as reasons for a Concept
p 152 - clarification to Individual entry of Post-it note task as Issues in EDN to improve distribution of work alignment with Technical Progress rubric #2 rubric
Also available in: Atom