terminology updates related to Engineering Definition
Playbookupdated based on 3hr meeting of PE'simproving alignment of slides w/ course flowspecific comments in version table at end of document
Agendaupdated some terminologyadjusted some timing to match Playbook
fixed link to Day 3 agenda
- project risk removed from status update row- expansion of N&R mention into Engineering Definition
slight formatting and punctuation fixes
terminology updated to add Use Cases and User Stories where N&R are mentioned
added software list to Bill of Materials Appendix
Updated Introduction instructions to specifically reference work done prior capstone team(s).
Updated Final Design Report and the instructions in Wiki.
Updated System Design Report template. Updated the Wiki page accordingly as well.
explanation added for alternative flow to be used on projects with 'different' problems
Updated Team Building Exercise Info
added instructions for splitting flow of report for projects with 'separate topics'.
BDR cancelled for F25 semester onwards
adjusted terminology related to DID and system evaluationadded some instructions
Added/improved examplesAdded student name columnremoved validation vs verification column
terminology related to Standards updated for consistency across both reportsLink added to Capstone Support page
EDN Usage statistics slide updated and added to Days 5 through 9
old documents not used since ~2020
some elaboration on instructions, example added, improved formatting of main worksheet
Updated the grade information in the Capstone Course - Overview slide.
Updated the graded assignments.
removed mention of BDR review and poster
BDR cancelled prior to F25 semester
month separator line thickenedexample note at top fixed
clarified wording around individual appendices for risks and individual demo
Also available in: Atom