removed "company" improved CE topics for day 3+4 meetings
Committing Instruction Manual for ABB Robot Cell
1. Project Overview row 1.1 Deleted "relevant background information" because of duplication.1.2 "long-term goals" was replaced by "with the client's goals" for clarification.2. Customer Needs and Engineering Requirements2.1 "specifications" was replaced by "requirements" because of consistency.
Deleted "and Engineering Specifications" from Section 5 heading.
deleted column one which was confusing students on tracking # vs explanation
migrated from Box to repo after small cleanup
Calendar view of scaffolded sessionsadded to https://designlab.eng.rpi.edu/edn/projects/capstone-support-dev/wiki/Capstone_Daily_Agendas
Added System Evaluation Worksheet.
change to Day 7 to highlight reflection on Project Plan
updated class 8 end slide to include eng standards assignment due
altered times for day 7 to clearly call out the reflection time
formatting to improve clarity of Repo url
Replaced the long term and short term slide with KD's re-typeset version.
Included additional slides about technical communication provided by Prof. Dannemann.
Added Capstone Design Showcase Information file.
updated Communication slides in Day 5
all semester / date info removed, file moved from Box to here
Clarified instructions to include selecting "Show Log" from Tortise SVN.
duplicated N&R slides for day 4
Update the Excel version of the Fabrication Space Assignments for F23.
Added F23 Fabrication Space Map
improvement to User Story slide
posting location of Skill Assessment
fixed miscalculation in Day 2 agenda timing
Clarified one thought per Post-It in ideation, added speaker note to Day 2 Action Items slide
Also available in: Atom