Moved the teams assigned to Pod 1 to Pod 2 (or Pod 4) so they can see the screen.
Added Section 3 BLE Mesh project to Team Meeting Spaces.pptx.
Added the S25 meeting space assignments.
Added the Spring 2024 meeting spaces.