1. Project Overview row 1.1 Deleted "relevant background information" because of duplication.1.2 "long-term goals" was replaced by "with the client's goals" for clarification.2. Customer Needs and Engineering Requirements2.1 "specifications" was replaced by "requirements" because of consistency.
Added the following files: final Design Report Rubric.docx, Final Design Review Rubric.docx, and Final Poster Rubric.docx.