Project

General

Profile

Statistics
| Revision:
Name Size Revision Age Author Comment
  2016-03-30-MATLAB Workshop 12 over 8 years Mark Anderson wanted to have a folder of this
  PSoC 15 about 8 years Mark Anderson accidentally committed hidden files
  Process Flowcharts 60 over 5 years Aren Paster changed location of flash drives from JEC 2027 ...
  Rubrics 84 almost 5 years Aren Paster reverting back to MY updated Rubric, which fixe...
  template documents 123 about 4 years Brad DeBoer Upload of new overall Design Report template do...
  training 119 about 4 years Mark Anderson some additional comments noting that none of us...
Fall 2020 Playbook.pptx 5.39 MB 122 about 4 years Aren Paster Shifted EDN instruction onto Day 5, updated log...
ReliabilityToolkit.pdf 20.7 MB 1 about 13 years Aren Paster Engineer's Reliability Toolkit developed by the...
ReliabilityToolkitIndex.pdf 468 KB 2 about 13 years Mark Anderson index for the Rome reliability tool kit

Latest revisions

# Date Author Comment
123 2020-09-14 09:40 AM Brad DeBoer

Upload of new overall Design Report template documents/Design Report Template.docx(re-named from Final Report Template F20)

122 2020-09-11 06:58 PM Aren Paster

Shifted EDN instruction onto Day 5, updated logistics of SoW exercise

121 2020-09-11 12:09 PM Mark Anderson

added animation to the needs and requirements slide to not reveal the second bullet until after the vehicle discussion.

120 2020-09-09 08:22 PM Brad DeBoer

Updated Playbook to move EDN/Documentation and Eng. Tools and Methods instruction from Class 4 to Class 5

119 2020-09-09 09:52 AM Mark Anderson

some additional comments noting that none of us control the internet quality

118 2020-09-09 09:20 AM Mark Anderson

some formatting, added a hyperlink to get straight to the tips section

117 2020-09-09 09:02 AM Mark Anderson

updated to provide support for ABET professional and societal considerations during requirements gathering

116 2020-09-09 09:00 AM Mark Anderson

JK created, to help software focused work better than the metrics based N&R spreadsheet does. One of MANY possible tools additional tools that might benefit software work.

115 2020-09-08 04:00 PM Aren Paster

terminology adjustment in Day 4 agenda, highlighted full list of Day 3+4 activities

114 2020-09-08 09:09 AM Brad DeBoer

Changed "Day Two" to "Day Three" on Eng. N/R slide

View all revisions | View revisions

Also available in: Atom