Project

General

Profile

Statistics
| Revision:
Name Size Revision Age Author Comment
  2016-03-30-MATLAB Workshop 12 over 8 years Mark Anderson wanted to have a folder of this
  PSoC 15 about 8 years Mark Anderson accidentally committed hidden files
  Process Flowcharts 60 over 5 years Aren Paster changed location of flash drives from JEC 2027 ...
  Rubrics 137 about 4 years Brad DeBoer Updated and renamed Rubric for Design Report Pr...
  template documents 136 about 4 years Mark Anderson typos and clarification that students can NOT c...
  training 119 about 4 years Mark Anderson some additional comments noting that none of us...
Fall 2020 Playbook.pptx 5.39 MB 135 about 4 years Aren Paster Class 9 content added
ReliabilityToolkit.pdf 20.7 MB 1 over 13 years Aren Paster Engineer's Reliability Toolkit developed by the...
ReliabilityToolkitIndex.pdf 468 KB 2 over 13 years Mark Anderson index for the Rome reliability tool kit

Latest revisions

# Date Author Comment
137 2020-10-08 11:15 AM Brad DeBoer

Updated and renamed Rubric for Design Report Preliminary Design Review Phase

136 2020-09-28 03:28 PM Mark Anderson

typos and clarification that students can NOT change the % complete, they can/should change the Status, so that the %complete gets updated.

135 2020-09-28 09:27 AM Aren Paster

Class 9 content added

134 2020-09-24 02:13 PM Junichi Kanai

Add Individual Risk Analyses Rubric.

133 2020-09-21 02:18 PM Aren Paster

fixed consistent naming

132 2020-09-21 12:47 PM Aren Paster

corrected agenda time

131 2020-09-21 08:37 AM Junichi Kanai

A Risk Analyses Memo template file was added.

130 2020-09-18 10:47 AM Mark Anderson

class 5 tweaks for the future... repo not forum for Design Report file

129 2020-09-17 04:21 PM Aren Paster

Day 7 sitkcy not Gantt chart content added

128 2020-09-17 09:12 AM Aren Paster

fleshed out Day 6 content

View all revisions | View revisions

Also available in: Atom