Project

General

Profile

Statistics
| Revision:
Name Size Revision Age Author Comment
  2016-03-30-MATLAB Workshop 12 almost 10 years Mark Anderson wanted to have a folder of this
  Course Documents 840 about 1 year Junichi Kanai Added the PDF version of Common Course Syllabus...
  ESP32 667 almost 2 years Mark Anderson Moved from the ebess-devices project where this...
  PSoC 15 over 9 years Mark Anderson accidentally committed hidden files
  Process Flowcharts 60 about 7 years Aren Paster changed location of flash drives from JEC 2027 ...
  Purchasing Forms 221 almost 5 years Valerie Masterson Getting ready to move purchasing forms
  Robotic Work Cell 595 over 2 years Brad DeBoer Committing Instruction Manual for ABB Robot Cell
  Rubrics 805 over 1 year Junichi Kanai Added an individual system evaluation rubric th...
  Software files 694 over 1 year Allen Xie Update Jetson guide
  playbook 841 about 1 year Aren Paster fixed typo on client meeting 1 ->2 on pg 139
  tags 801 over 1 year Aren Paster name change to follow convention
  template documents 838 about 1 year Aren Paster formatting and grammar updates to clarify work ...
  training 806 over 1 year Aren Paster name change to encourage students to watch the ...
Design Lab Cabinet Inventory.docx 59.4 KB 488 about 3 years Aren Paster inventory list of all parts in cabinets in shop...
ReliabilityToolkit.pdf 20.7 MB 1 over 14 years Aren Paster Engineer's Reliability Toolkit developed by the...
ReliabilityToolkitIndex.pdf 468 KB 2 over 14 years Mark Anderson index for the Rome reliability tool kit

Latest revisions

# To From Date Author Comment
841 2025-02-06 10:31 AM Aren Paster

fixed typo on client meeting 1 ->2 on pg 139

840 2025-02-04 03:13 PM Junichi Kanai

Added the PDF version of Common Course Syllabus (v1.2).

839 2025-02-04 03:04 PM Junichi Kanai

The due dates of the System Design Report and Preliminary Peer Evaluation assignments were extended to 2/21 and 2/24, respectively.

838 2025-02-04 02:40 PM Aren Paster

formatting and grammar updates to clarify work required for S24 rollout

837 2025-02-03 11:56 AM Aren Paster

tweaked initialing of Post-It notes

836 2025-01-31 03:28 PM Aren Paster

Day 8 timing adjusted
Reflecting on Project plan removed
more time to Project planning intro

835 2025-01-27 04:25 PM Mark Anderson

slides to better match the agenda

834 2025-01-27 04:18 PM Mark Anderson

corrected duration for concept selection

833 2025-01-27 01:07 PM Junichi Kanai

Updated the fabrication space assignments for the spring of 2025.

832 2025-01-27 09:13 AM Aren Paster

updated dates on System Design Report

View all revisions | View revisions

Also available in: Atom