Project

General

Profile

Statistics
| Revision:
Name Size Revision Age Author Comment
  2016-03-30-MATLAB Workshop 12 over 9 years Mark Anderson wanted to have a folder of this
  Course Documents 840 8 months Junichi Kanai Added the PDF version of Common Course Syllabus...
  ESP32 667 over 1 year Mark Anderson Moved from the ebess-devices project where this...
  PSoC 15 about 9 years Mark Anderson accidentally committed hidden files
  Process Flowcharts 60 over 6 years Aren Paster changed location of flash drives from JEC 2027 ...
  Purchasing Forms 221 over 4 years Valerie Masterson Getting ready to move purchasing forms
  Robotic Work Cell 595 almost 2 years Brad DeBoer Committing Instruction Manual for ABB Robot Cell
  Rubrics 805 10 months Junichi Kanai Added an individual system evaluation rubric th...
  Software files 694 about 1 year Allen Xie Update Jetson guide
  playbook 842 8 months Aren Paster Tweaks to Day 10 discussion of system Design re...
  tags 801 10 months Aren Paster name change to follow convention
  template documents 838 8 months Aren Paster formatting and grammar updates to clarify work ...
  training 806 10 months Aren Paster name change to encourage students to watch the ...
Design Lab Cabinet Inventory.docx 59.4 KB 488 over 2 years Aren Paster inventory list of all parts in cabinets in shop...
ReliabilityToolkit.pdf 20.7 MB 1 about 14 years Aren Paster Engineer's Reliability Toolkit developed by the...
ReliabilityToolkitIndex.pdf 468 KB 2 about 14 years Mark Anderson index for the Rome reliability tool kit

Latest revisions

# To From Date Author Comment
842 2025-02-09 03:16 PM Aren Paster

Tweaks to Day 10 discussion of system Design report and DID Appendix
Updated due date

841 2025-02-06 10:31 AM Aren Paster

fixed typo on client meeting 1 ->2 on pg 139

840 2025-02-04 03:13 PM Junichi Kanai

Added the PDF version of Common Course Syllabus (v1.2).

839 2025-02-04 03:04 PM Junichi Kanai

The due dates of the System Design Report and Preliminary Peer Evaluation assignments were extended to 2/21 and 2/24, respectively.

838 2025-02-04 02:40 PM Aren Paster

formatting and grammar updates to clarify work required for S24 rollout

837 2025-02-03 11:56 AM Aren Paster

tweaked initialing of Post-It notes

836 2025-01-31 03:28 PM Aren Paster

Day 8 timing adjusted
Reflecting on Project plan removed
more time to Project planning intro

835 2025-01-27 04:25 PM Mark Anderson

slides to better match the agenda

834 2025-01-27 04:18 PM Mark Anderson

corrected duration for concept selection

833 2025-01-27 01:07 PM Junichi Kanai

Updated the fabrication space assignments for the spring of 2025.

View all revisions | View revisions

Also available in: Atom