Capstone Daily Agendas - Detailed view of first few weeks of on-site activities

Tasks and Due Dates

All dates and times are based in Troy, NY. Tasks must be completed and submitted before class unless special instructions are provided.

Guidelines / instructions can be found on the Task Guidelines page.

List Style

Graded assignments are highlighted.
  • Team Assignment
  • Individual Assignment

Other assignments are assessed, not graded, and are used to provide feedback.

Task/Deliverable Due Date Sec 1&2 (Sec 3&4) Type Guidelines & Hints Self-Evaluation Rubric/Checklist
Project Initiation Phase
Classes Begin 8/27
Onboarding Day # 1 8/27 (8/28) Team Day 1 Agenda
Activities Day # 1 multiple Activities Day 1 Activities
Onboarding Day # 2 8/31 (9/01) Team Day 2 Agenda
Activities Day # 2 multiple Activities Day 2 Activities
Client Meeting #1 - Kickoff 9/03 (Day # 3) - 9/10 (Day # 4) approximate date - team and PE to confirm actual date/time Team Client Meetings Feedback Only - Need a feedback form
Project Scoping Day # 3 9/03 (9/04) Team Day 3 Agenda
Activities Day # 3 multiple Activities Day 3 Activities
Labor Day - No Class 9/07
Fabrication Facility Opens 9/08
Project Scoping Day # 4 9/10 (9/08) Team Day 4 Agenda
Activities Day # 4 multiple Activities Day 4 Activities
On-Line Safety Training 9/09 (9/07) at 11:59PM Individual Safety None
Technical Memo 9/13 (9/10) at 11:59PM Individual Technical Memo export:Rubrics\Technical Memo Rubric.pdf
Project Scoping Day # 5 9/14 (9/11) Team Day 5 Agenda
Team Standards Agreement 9/16 (9/14) at 11:59PM Team Team Standards Agreement None
Activities Day # 5 multiple Activities Day 5 Activities
Project Planning Phase
Draft Engineering Definition 9/16 (9/14) at 11:59PM Team Needs and Requirements Feedback Only - export:Rubrics\Engineering Definitions Rubric.pdf Need a feedback form
User Stories
Use Cases
Project Scoping Day # 6 9/17 (9/15) Team Day 6 Agenda
Activities Day # 6 multiple Activities Day 6 Activities
Technical Progress and Project Management #1 Up to 9/16 (9/14) @ 11:59 PM Individual Technical Progress export:Rubrics\Technical Progress and Project Management #1-Fillable.pdf
Individual CE Feedback # 1 week of 9/21-9/25 Individual Individual CE Feedback # 1 None
Project Scoping Day # 7 9/21 (9/18) Team Day 7 Agenda
Activities Day # 7 multiple Activities Day 7 Activities
Concept Generation & Selection 9/23 (9/21) @11:59 PM Team Concept Generation & Selection export:Rubrics\Concept Generation & Selection rubric.xlsx
Project Scoping Day # 8 9/24 (9/22) Team Day 8 Agenda
Activities Day # 8 multiple Activities Day 8 Activities
Client Meeting # 2 9/25 (Day # 9) - 10/1 (Day # 10) approximate date - team and PE to confirm actual date/time Team Client Meetings export:Rubrics\Client Meeting 2 Rubric.docx
Open Issues using EDN 9/28 (9/25) Team/Individual EDN_FAQ
Set Milestones (Versions) Using EDN 9/28 (9/25) Team export:training\Creating Versions from your Statement of Work.mp4
Project Scoping Day # 9 9/28 (9/25) Team Day 9 Agenda
Activities Day # 9 multiple Activities Day 9 Activities
Day # 10 10/01 (9/29) Team Day 10 Agenda
Activities Day # 10 multiple Activities Day 10 Activities
Day # 11 10/05 (10/02) Team Day 11 and Beyond
Project Execution and Control Phase
Technical Progress and Project Management #2 Up to 10/8 (10/6) @11:59 PM Individual Technical Progress export:Rubrics\Technical Progress and Project Management #2.pdf
Columbus Day - No Class 10/12
Board of Directors Review 10/15 (10/13) Team Board of Directors Review export:Rubrics\TBD
Individual export:Rubric\TBD
Client Meeting # 3 10/22-10/27 approximate date - team and PE to confirm actual date/time Team Client Meetings export:Rubrics\Client Meeting 3 Rubric.docx
System Design Report 10/21 (10/21) @11:59 PM Team System Design Report export:Rubrics\System Design Report Rubric.docx
Appendix - Detailed Individual Design Individual export:Rubrics\Detailed Individual Design Rubric.docx
Preliminary Peer Evaluation (Bonus Point) 10/23 @11:59 PM Individual Preliminary Peer Evaluation and Self-Reflection NA
Individual CE Feedback # 2 week of 10/26-10/30 Individual Individual CE Feedback # 2 Review technical contributions export:Rubrics\Teamwork rubric.docx, export:Rubrics\Oral communication rubric.docx
Engineering Definition 10/29 (10/30) @11:59 PM Team Needs and Requirements export:Rubrics\Engineering Definitions Rubric.pdf
User Stories
Use Cases
Client Meeting # 4 11/09 - 11/13 approximate date - team and PE to confirm actual date/time Team Client Meetings Feedback only per export:Rubrics\Client Meeting 3 Rubric.docx
Draft Individual Technical Demo Plan 11/08 (11/09) @11:59 PM Individual Individual Technical Demo Feedback only per export:Rubrics\Individual Technical Demo Rubric.docx
Individual CE Feedback # 3 week of 11/16-11/20 Individual Individual CE Feedback # 3 Review individual performance export:Rubrics\Teamwork rubric.docx, export:Rubrics\Oral communication rubric.docx
Technical Progress and Project Management # 3 Up to 11/16 (11/17) @11:59 PM Individual Technical Progress export:Rubrics\Technical Progress and Project Management Rubric-Fillable.pdf
Updated Individual Technical Demo Plan 11/15 (11/16) @11:59 PM Individual Individual Technical Demo Feedback only per export:Rubrics\Individual Technical Demo Rubric.docx
Individual Technical Demo 11/19 (11/20) In-class Individual Individual Technical Demo export:Rubrics\Individual Technical Demo Rubric.docx
Thanksgiving Week (No class) 11/23 - 11/27
Draft Final Report 12/02 @11:59 PM Team Final Design Report export:Rubrics\Final Design Report Rubric.docx
Draft Poster 12/02 at 11:59PM Team Poster export:Rubrics\Final Poster Rubric.docx
Final Poster 12/08 at 11:59PM Team Poster export:Rubrics\Final Poster Rubric.docx
Design Showcase 12/09 1pm-4pm Team Capstone Design Showcase
Final Design Report 12/11 at 11:59PM Team Final Design Report export:Rubrics\Final Design Report Rubric.docx
Appendix - Individual Ethical and Professional Consideration Individual export:Rubrics\Ethical and Professional Responsibilities Rubric-Fillable.pdf
Technical Progress and Project Management #4 Up to 12/11 at 11:59PM Individual Technical Progress export:Rubrics\Technical Progress and Project Management Rubric-Fillable.pdf
Final Design Review (PowerPoint) ANY weekday during the final week of classes through Exam Week (12/7-12/22) Team Final Design Review Instructions export:Rubrics\Final Design Review Rubric - Fillable.pdf
Project Closing Phase
Reading Days 12/14 & 12/15
Final Peer Evaluation and Self-Reflection (Bonus Point) 12/15@11:59PM Individual Final Peer Evaluation and Self-Reflection NA
Technology Transfer During the Final Exam Week (12/16-12/22) Team Technology Transfer NA

Gantt Style

The above list (with different color coding) is presented as a Gantt chart:

Back to Course Materials

High Level Overview

Up Front Project Definition and Planning Phase ( by Class Number)

Class #     Topics
1           Onboarding (Introduction, Course Information)
2           Onboarding (Course Information, Team Development), Engineering Definition
3 + 4       Project Kickoff Meeting (Client Meeting #1), Engineering Definition, Past Work review
5           Concept Generation
6           Course Tools, Identify Deliverables, Engineering Definition
7           Project Work, Concept Selection
8           Develop Project Plan
9 + 10      Client Meeting #2, Project Plan Review, Project Execution

Remaining Class Meetings - Execute to the Project Plan
                           Client Meetings #3 & #4, Final Design Review

Action Items

Action Items for each day are listed at the end of the Capstone_Daily_Agendas