Capstone_Daily_Agendas - Detailed view of first few weeks of on-site activities¶
- Table of contents
- Tasks and Due Dates
Tasks and Due Dates¶
All dates and times are based in Troy, NY. Tasks must be completed and submitted before class unless special instructions are provided.
Guidelines / instructions can be found on the Task Guidelines page.
List Style¶
Graded assignments are highlighted.- Team Assignment
- Individual Assignment
Other assignments are assessed, not graded, and are used to provide feedback.
Task/Deliverable | Due Date Sec 1&2 (Sec 3&4) | Type | Guidelines & Hints | Self Evaluation Rubric/Check List |
---|---|---|---|---|
Project Initiation Phase | ||||
Classes Begin | 1/6 | |||
Onboarding Day # 1 | 1/6 (1/7) | Team | Day 1 Agenda | |
Assignments Day # 1 | multiple | Assignment | Day 1 Assignments | |
Onboarding Day # 2 | 1/9 (1/10) | Team | Day 2 Agenda | |
Assignments Day # 2 | multiple | Assignment | Day 2 Assignments | |
Client Meeting #1 - Kickoff | 1/13-1/16 approximate date - team and PE to confirm actual date/time | Team | Client Meetings | |
Project Scoping Day # 3 | 1/13 (1/14) | Team | Day 3 Agenda | |
Assignments Day # 3 | multiple | Assignment | Day 3 Assignments | |
Project Scoping Day # 4 | 1/16 (1/17) | Team | Day 4 Agenda | |
Assignments Day # 4 | multiple | Assignment | Day 4 Assignments | |
Martin Luther King Jr. Day (No class) | 1/20 | |||
Fabrication Facility Opens | 1/21 | |||
Benchmarking Memo | 1/23 (1/21) | Individual | Benchmarking Memo | export:Rubrics\Benchmarking Memo Rubric.pdf |
Project Scoping Day # 5 | 1/23 (1/21) | Team | Day 5 Agenda | |
Assignments Day # 5 | multiple | Assignment | Day 5 Assignments | |
On-Line Safety Training | End of 3rd Week - 1/24 | Individual | Safety | None |
Technical Progress and Project Management #1 | Up to 1/27 (1/24) | Individual | Technical Progress | export:Rubrics\Technical Progress and Project Management #1-Fillable.pdf |
Project Planning Phase | ||||
Team Standards Agreement | 1/27 (1/24) Before Day #6 | Team | Team Standards Agreement | None |
Needs & Requirements workbook Ver. 1 | 1/27 (1/24) | Team | Needs and Requirements | Feedback Only - export:Rubrics\Needs and Requirements rubric.docx |
Set Milestones (Versions) Using EDN | 1/27 (1/24) | Team | export:training\Creating Versions from your Statement of Work.mp4 | |
Project Scoping Day # 6 | 1/27 (1/24) | Team | Day 6 Agenda | |
Assignments Day # 6 | multiple | Assignment | Day 6 Assignments | |
Individual CE Feedback #1 | 1/28-2/3 | Individual | Individual CE Feedback # 1 | None |
Project Scoping Day # 7 | 1/30 (1/27) | Team | Day 7 Agenda | |
Assignments Day # 7 | multiple | Assignment | Day 7 Assignments | |
Concept Generation & Selection | 2/3 (1/31) | Team | Concept Generation & Selection | export:Rubrics\Concept Generation & Selection rubric.xlsx |
Project Scoping Day # 8 | 2/3 (1/31) | Team | Day 8 Agenda | |
Assignments Day # 8 | multiple | Assignment | Day 8 Assignments | |
Client Meeting #2 | 2/4 (Day #9) - 2/10 (Day #10) approximate date - team and PE to confirm actual date/time | Team | Client Meetings | export:Rubrics\Client Meeting 2 Rubric.docx |
Open Issues using EDN | 2/6 (2/4) | Team/Individual | EDN_FAQ | |
Project Scoping Day # 9 | 2/6 (2/4) | Team | Day 9 Agenda | |
Assignments Day # 9 | multiple | Assignment | Day 9 Assignments | |
Day # 10 & Beyond | 2/10 (2/7) | Team | Day 10 Agenda | |
Assignments Day # 10 | multiple | Assignment | Day 10 Assignments | |
Day # 11 & Beyond | 2/13 (2/11) | Team | Day 11 and Beyond | |
Board of Directors Review - Poster and Oral Presentation | 2/13 (2/14) | Team | Board of Directors Review |
export:Rubrics\Board of Directors Review Rubric.docx |
Individual | ||||
President Day (No Class) | 2/17 | |||
Technical Progress and Project Management #2 | Up to 2/18 (2/14) | Individual | Technical Progress | Under Construction |
System Design Report | 2/18 | Team | Under Construction | Under Construction |
Appendix - Detailed Individual Design Section | Individual | |||
Preliminary Peer Evaluation (Bonus Point) | 2/19 | Individual | Preliminary Peer Evaluation and Self-Reflection | NA |
Client Meeting # 3 | Week 8: 2/24-2/28 approximate date - team and PE to confirm actual date/time | Team | Client Meetings | export:Rubrics\Client Meeting 3 Rubric.docx |
Individual CE Feedback # 2 | 2/24-2/28 | Individual | Individual CE Feedback # 2 | Review technical contributions export:Rubrics\Teamwork rubric.docx, export:Rubrics\Oral communication rubric.docx |
Needs & Requirements workbook | 2/27 (2/28) | Team | Needs and Requirements | export:Rubrics\Needs and Requirements Rubric.pdf |
Spring Break | 3/3-3/7 | |||
Individual CE Feedback #3 | As needed | Individual | Individual CE Feedback # 3 | Review individual performance export:Rubrics\Teamwork rubric.docx, export:Rubrics\Oral communication rubric.docx |
Technical Progress and Project Management #3 | Up to 3/27 (3/28) | Individual | Technical Progress | Under Construction |
Project Execution and Control Phase | ||||
Client Meeting # 4 | Week 12: 3/24-3/28 approximate date - team and PE to confirm actual date/time | Team | Client Meetings | Not graded; Feedback offered per Client Meeting 3 Rubric |
Draft Final Report | 4/9 -> 4/11 Fri | Team | Final Design Report | export:Rubrics\Final Design Report Rubric.docx |
Draft Poster | 4/9 -> 4/11 Fri | Team | Poster | export:Rubrics\Final Poster Rubric.docx |
Individual Technical Demo | 4/17 (4/18) | Individual | Under Construction | Under Construction |
Design Showcase | 4/23 | Team | Capstone Design Showcase | |
Final Design Report | 4/23 @ 11:59PM | Team | Final Design Report | Under Construction |
Appendix - Individual Ethical and Professional Consideration | Individual | |||
Final Poster | 4/23 @ 11:59PM | Team | Poster | export:Rubrics\Final Poster Rubric.docx |
Technical Progress and Project Management #4 | Up to 4/23 | Individual | Technical Progress | Under Construction |
Final Design Review (PowerPoint) | ANY weekday during the final week of classes through Exam Week (4/24-5/2) | Team | Final Design Review Instructions | export:Rubrics\Final Design Review Rubric - Fillable.pdf |
Project Closing Phase | ||||
Final Peer Evaluation and Self-Reflection (Bonus Point) | 4/25 @ 11:59PM | Individual | Final Peer Evaluation and Self-Reflection | NA |
Technology Transfer | During the Final Exam Week (4/28-5/2) | Team | Technology Transfer | NA |
Gantt Style¶
The above list (with different color coding) is presented as a Gantt chart:
Action Items¶
Action Items for each day are listed at the end of the Capstone_Daily_Agendas