Tasks and Due Dates

All dates and times are based in Troy, NY. Tasks must be completed and submitted before class unless special instructions are provided.

Guidelines / instructions can be found on the Task Guidelines page.

List Style

Graded assignments are highlighted.
  • Team Assignment
  • Individual Assignment

Other assignments are assessed, not graded, and are used to provide feedback.

Task/Deliverable Due Date Sec 1&2 (Sec 3&4) Type Guidelines & Hints Self-Evaluation Rubric/Checklist
Project Initiation Phase
Classes Begin 1/12
Onboarding Day # 1 1/12 (1/13) Team Day 1 Agenda
Assignments Day # 1 multiple Assignment Day 1 Assignments
Onboarding Day # 2 1/15 (1/16) Team Day 2 Agenda
Assignments Day # 2 multiple Assignment Day 2 Assignments
Martin Luther King Day (No class) 1/19
Client Meeting #1 - Kickoff 1/20(Day # 3) - 1/26 (Day # 4) approximate date - team and PE to confirm actual date/time Team Client Meetings Feedback Only
Project Scoping Day # 3 1/22 (1/20) Team Day 3 Agenda
Assignments Day # 3 multiple Assignment Day 3 Assignments
Project Scoping Day # 4 1/26 (1/24) Team Day 4 Agenda
Assignments Day # 4 multiple Assignment Day 4 Assignments
Fabrication Facility Opens 1/26
Benchmarking Memo 1/28 (1/26) @11:59 PM Individual Benchmarking Memo export:Rubrics\Benchmarking Memo Rubric.pdf
Project Scoping Day # 5 1/29 (1/27) Team Day 5 Agenda
Assignments Day # 5 multiple Assignment Day 5 Assignments
On-Line Safety Training 2/1 (1/29) @11:59 PM Individual Safety None
Project Planning Phase
Team Standards Agreement 2/1 (1/29) @11:59 PM Team Team Standards Agreement None
Engineering Definition 2/1 (1/29) @11:59 PM Team Needs and Requirements Feedback Only - export:Rubrics\Engineering Definitions Rubric.pdf
User Stories
Use Cases
Set Milestones (Versions) Using EDN 2/2 (1/30) Team export:training\Creating Versions from your Statement of Work.mp4
Project Scoping Day # 6 2/2 (1/30) Team Day 6 Agenda
Assignments Day # 6 multiple Assignment Day 6 Assignments
Technical Progress and Project Management #1 Up to 2/2 (1/30) @ 11:59 PM Individual Technical Progress export:Rubrics\Technical Progress and Project Management #1-Fillable.pdf
Individual CE Feedback # 1 2/3-2/9 Individual Individual CE Feedback # 1 None
Project Scoping Day # 7 2/5 (2/3) Team Day 7 Agenda
Assignments Day # 7 multiple Assignment Day 7 Assignments
Concept Generation & Selection 2/9 (2/6) @11:59 PM Team Concept Generation & Selection export:Rubrics\Concept Generation & Selection rubric.xlsx
Project Scoping Day # 8 2/9 (2/6) Team Day 8 Agenda
Assignments Day # 8 multiple Assignment Day 8 Assignments
Client Meeting # 2 2/10 (Day # 9) - 2/17 (Day # 10) approximate date - team and PE to confirm actual date/time Team Client Meetings export:Rubrics\Client Meeting 2 Rubric.docx
Open Issues using EDN 2/12 (2/10) Team/Individual EDN_FAQ
Project Scoping Day # 9 2/12 (2/10) Team Day 9 Agenda
Assignments Day # 9 multiple Assignment Day 9 Assignments
President's Day (No Class) 2/16
Day # 10 & Beyond 2/17 (2/13) Team Day 10 Agenda
Assignments Day # 10 multiple Assignment Day 10 Assignments
Day # 11 & Beyond 2/19 (2/20) Team Day 11 and Beyond
Project Execution and Control Phase
Individual CE Feedback # 2 2/23-2/27 Individual Individual CE Feedback # 2 Review technical contributions export:Rubrics\Teamwork rubric.docx, export:Rubrics\Oral communication rubric.docx
Technical Progress and Project Management #2 Up to 2/23 (2/24) @11:59 PM Individual Technical Progress export:Rubrics\Technical Progress and Project Management #2.pdf
Spring Break (No class) 3/2-3/6
Client Meeting # 3 3/12-3/17 approximate date - team and PE to confirm actual date/time Team Client Meetings export:Rubrics\Client Meeting 3 Rubric.docx
System Design Report 3/13 @11:59 PM Team System Design Report export:Rubrics\System Design Report Rubric.docx
Appendix - Detailed Individual Design Individual export:Rubrics\Detailed Individual Design Rubric.docx
Preliminary Peer Evaluation (Bonus Point) Updated! 3/16 @11:59 PM Individual Preliminary Peer Evaluation and Self-Reflection NA
Engineering Definition 3/23 (3/24) @11:59 PM Team Needs and Requirements export:Rubrics\Engineering Definitions Rubric.pdf
User Stories
Use Cases
Individual CE Feedback # 3 As needed (Before 3/27) Individual Individual CE Feedback # 3 Review individual performance export:Rubrics\Teamwork rubric.docx, export:Rubrics\Oral communication rubric.docx
Technical Progress and Project Management # 3 Up to 3/26 (3/27) @11:59 PM Individual Technical Progress export:Rubrics\Technical Progress and Project Management Rubric-Fillable.pdf
Client Meeting # 4 Week 12: 4/2-4/7 approximate date - team and PE to confirm actual date/time Team Client Meetings Feedback only per export:Rubrics\Client Meeting 3 Rubric.docx
Individual Technical Demo Plan 4/7 @11:59 PM Individual Individual Technical Demo Feedback only per export:Rubrics\Individual Technical Demo Rubric.docx
Updated Individual Technical Demo Plan 4/12 @11:59 PM Individual Individual Technical Demo Feedback only per export:Rubrics\Individual Technical Demo Rubric.docx
Draft Final Report 4/12 @11:59 PM Team Final Design Report export:Rubrics\Final Design Report Rubric.docx
Individual Technical Demo 4/13 (4/14) In-class Individual Individual Technical Demo export:Rubrics\Individual Technical Demo Rubric.docx
Draft Poster 4/15 @11:59 PM Team Poster export:Rubrics\Final Poster Rubric.docx
Final Poster 4/19 @11:59 PM Team Poster export:Rubrics\Final Poster Rubric.docx
Design Showcase 4/22 1pm-4pm Team Capstone Design Showcase
Final Design Report 4/29 @11:59PM Team Final Design Report export:Rubrics\Final Design Report Rubric.docx
Appendix - Individual Ethical and Professional Consideration Individual export:Rubrics\Ethical and Professional Responsibilities Rubric-Fillable.pdf
Technical Progress and Project Management #4 Up to 4/29 @ 11:59 PM Individual Technical Progress export:Rubrics\Technical Progress and Project Management Rubric-Fillable.pdf
Final Design Review (PowerPoint) ANY weekday during the final week of classes through Exam Week (4/27-5/8) Team Final Design Review Instructions export:Rubrics\Final Design Review Rubric - Fillable.pdf
Individual
Project Closing Phase
Final Peer Evaluation and Self-Reflection (Bonus Point) 5/3 @11:59PM Individual Final Peer Evaluation and Self-Reflection NA
Technology Transfer During the Final Exam Week (5/4-5/8) Team Technology Transfer NA

Gantt Style

The above list (with different color coding) is presented as a Gantt chart:

Back to Course Materials

Action Items

Action Items for each day are listed at the end of the Capstone_Daily_Agendas